Project Details

previous arrow
next arrow
ArrowArrow
Slider

Description

Complete Refurbishment to Bracknell’s indoor water park. The works included the removal and replacement of the existing roof with a prefabricated structural deck as well as securing acoustic insulation. There was also a construction of a new flume tower to which RRCL installed the Kingspan wall panels.